The Former Houston Wood
Preserving Works Site
ERM Monitoring Report Second Semiannual Event 2001
15-ERM Monitoring Report Second Semiannual Event 2001
ERM Monitoring Report First Semiannual Event 2001
14-ERM Monitoring Report First Semiannual Event 2001
ERM Monitoring Report First Semiannual Event 2000
13-ERM Monitoring Report First Semiannual Event 2000
ERM Monitoring Report Second Semiannual Event 1999
12-ERM Monitoring Report Second Semiannual Event 1999
ERM Monitoring Report First Semiannual Event 1999
11-ERM Monitoring Report First Semiannual Event 1999
HWPW Phase 2B September 1999
3-HWPW Phase 2B September 1999
ERM Annual Report Permit No. HW-05343,Jan1-Dec31, 1998
10-ERM Annual Report Permit No. HW-05343,Jan1-Dec31, 1998
HWPW Phase 2 February 1998
2-HWPW Phase 2 Feruary 1998
Terranext GW First Semiannual Period 1996
3-Terranext GW First Semiannual Period 1996
Terranext CP Semi-Annual Report Jan1 through June 30, 1996
2-Terranext CP Semi-Annual Report Jan1 through June 30, 1996
HWPW Phase I RFI Terranext May 1996
1-HWPW Phase I RFI Terranext May 1996
Terranext Annual Report Jan1 through Dec 31,1995
1-Terranext Annual Report Jan1 through Dec 31,1995
Site-Wide Ground Water Report – March 31, 2022
Houston TX – Site-Wide Ground Water Report – March 31, 2022
TCEQ Approval Letter 20220216
Houston, tx – Wood Preserving Works – TCEQ Approval Letter 20220216
Solid Waste Management Unit 1 – 2021 2nd Semi-Annual Report
Houston TX – Wood Preserving Works – SWMU No 1 2021 2nd SA Report 20220120
MONTHLY STATUS UPDATE – ENGLEWOOD INTERMODAL YARD – NAPL COLLECTION SYSTEM/CONCRETE CAP REPAIRS – JANUARY 2022
MONTHLY STATUS UPDATE – ENGLEWOOD INTERMODAL YARD – NAPL COLLECTION SYSTEM/CONCRETE CAP REPAIRS – JANUARY 2022
MONTHLY STATUS UPDATE – ENGLEWOOD INTERMODAL YARD – NAPL COLLECTION SYSTEM/CONCRETE CAP REPAIRS
MONTHLY STATUS UPDATE – ENGLEWOOD INTERMODAL YARD – NAPL COLLECTION SYSTEM/CONCRETE CAP REPAIRS
Corrective Action Monitoring Report: 2022 First Semi-Annual Event for the Union Pacific Railroad (UPRR) Houston, TX – Wood Preserving Works site (SWR 31547)
Corrective Action Monitoring Report: 2022 First Semi-Annual Event for the Union Pacific Railroad (UPRR) Houston, Tx – Wood Preserving Works site (SWR 31547)
Approval of Response to Comments dated September 22, 2021 which contains the September 22, 2021 Updated Proposed City of Houston Storm Water Sewer Assessment Work Plan
IHWCA_31547_OUT_20210929_Approval- COH SW Assessment WP_26617013