August 19, 2022 – Notification letter to the Texas Commission on Environmental…
August 19, 2022 – Notification letter to the Texas Commission on Environmental Quality (TCEQ) of fence construction and baseline soil sampling activities within the Englewood Intermodal Yard (EIY)
RE: WEEKLY STATUS UPDATE – ENGLEWOOD YARD NORTH BYPASS PROJECT UNION PACIFIC…
RE: WEEKLY STATUS UPDATE – ENGLEWOOD YARD NORTH BYPASS PROJECT UNION PACIFIC RAILROAD HOUSTON WOOD PRESERVING WORKS SITE
RCRA Post-Closure Care Permit and Response Action Plan – Summary of Planned…
RCRA Post-Closure Care Permit and Response Action Plan – Summary of Planned Activities For decades, Union Pacific Railroad (UPRR) has been conducting cleanup activities at the Houston Wood Preserving Site (“Site”) under the supervision of the Texas Commission on Environmental Quality (TCEQ).
IHWCA_31547_OUT_20210929_Approval- COH SW Assessment WP_26617013
IHWCA_31547_OUT_20210929_Approval- COH SW Assessment WP_26617013
IHWCA_31547_OUT_20210831_Comments- Storm Water Sewer Ass WP
IHWCA_31547_OUT_20210831_Comments- Storm Water Sewer Ass WP
Houston tx – Wood Preserving Works – COH SW Line Assessment WP…
Houston tx – Wood Preserving Works – COH SW Line Assessment WP Response Letter_20210922
2-Houston, tx – Wood Preserving Works – Post-Harvey PRACR Updated – 20180117
2-Houston, tx – Wood Preserving Works – Post-Harvey PRACR Updated – 20180117
Environmental testing will be conducted on the City of Houston’s right‐of‐way near…
Environmental testing will be conducted on the City of Houston’s right‐of‐way near your property. Please note there will be a temporary roadway closure, which was approved by the City of Houston. Beginning February 5, 2020, a portion of the street near your residence may be closed during working hours (8 am to 5 pm) over the next 2 to 3 weeks. The roadway closure should not prevent you from accessing your driveway during this time.
Environmental testing will be conducted on City of Houston right‐of‐way near your…
Environmental testing will be conducted on City of Houston right‐of‐way near your property. Please note there will be a temporary sidewalk closure as approved by the City of Houston through a sidewalk impairment permit. Beginning January 28, 2020, a portion of the sidewalk near your residence may be closed during working hours (8 am to 5 pm) over the next 2 weeks.
Union Pacific Railroad Company, owner of the Houston Wood Preserving Works located…
Union Pacific Railroad Company, owner of the Houston Wood Preserving Works located at 4910 Liberty Road, Houston, 77026, in Harris County, has applied to the Texas Commission on Environmental Quality (TCEQ) for a renewal and major amendment of Hazardous Waste Permit/Compliance Plan No. 50343 to authorize: the continued post-closure care and corrective action at the facility; the addition of solid waste management units and areas of concern subject to corrective action; updates to on-site and off-site plume management zones; the addition of a Response Action Plan to address soil and groundwater contamination; the addition of alternate point of exposure wells; a facility name change from Union Pacific Railroad Company, Houston Tie Plant to Union Pacific Railroad Company, Houston Wood Preserving Works; changes in the facility legal description, financial assurance, and to the facility boundary; typographical corrections; and administrative changes. TCEQ received the application on December 10, 2014. The following link to an electronic map of the facility or the facility’s general location is provided as a public courtesy and is not part of the application or notice: https://arcg.is/1izXTy. For exact location, refer to application.
Skip to content